[1]Lenstra J K, Rinnooy Kan A H G, Brucker P. Complexity of Machine Scheduling Problems[J]. Annals of Discrete Mathematics, 1997,1: 343-362.
[2]Graham R L. Boundson Multiprocessor Timing Anomalies[J]. SIAM Journal on Applied Mathematics, 1969, 17: 416-429.
[3]Coffman E G, Garey M R, Johnson D S. An Applicationof Bin-packing to Multipossor Scheduling[J]. SIAM Journal on Computing, 1978, 7: 1-17.
[4]Friesen D K. Tighter Bounds for the Multifit Processor Scheduling Algorithm[J]. SIAM Journal on Computing, 1984, 13: 170-181.
[5]Thesen A. Designand Evaluation of Tabu Search Algorithms for Multiprocessor Scheduling[J]. Journal of Heuristics, 1998, 4: 141-160.
[6]Lee W C, Wu C C, Chen P. A Simulated Annealing Approach to Makespan Minimizationon Identical Parallel Machines[J]. International Journal of Advanced Manufacturing Technology, 2006, 31:328-334.
[7]李凯, 左春荣. 基于模拟退火的多处理机调度优化算法研究[J]. 系统工程与电子技术, 2009, 31(12): 2963-2967.
Li Kai, Zuo Chunrong. Research on Optimization Algorithm for Multiprocessor Scheduling Problem Based on Simulated Annealing[J]. Systems Engineering and Electronics, 2009,31(12): 2963-2967.
[8]Nowicki E, Zdrzaka S. A Bicriterion Approach to Preemptive Scheduling of Parallel Machines with Controllable Job Processing Times[J]. Discrete Applied Mathematics, 1995, 63: 237-256.
[9]Li K, Shi Y, Yang S, et al. Parallel Machine Scheduling Problem to Minimize Makespan with Resource Dependent Processing Times[J]. Applied Soft Computing, 2011,11(8): 5551-5557.
[10]Jansen K, Mastrolilli M. Approximation Schemesfor Parallel Machine Scheduling Problem with Controllable Processing Times[J]. Computers & Operations Research, 2004, 31: 1565-1581.
[11]史烨, 李凯, 左春荣. 加工时间依赖于资源消耗量的平行机调度问题[J]. 系统工程理论与实践, 2012,32(7): 1485-1493.
Shi Ye, Li Kai, Zuo Chunrong. Parallel Machine Scheduling Problem with Resource Dependent Processing Times[J]. Systems Engineering-Theory & Practice, 2012,32(7): 1485-1493.
[12]Shabtay D, Kaspi M. Parallel Machine Schedulingwith a Convex Resource Consumption Function[J]. European Journal of Operational Research, 2006, 173(1): 92-107.
[13]李凯, 史烨, 马英. 具有凸资源消耗函数的最小化Makespan的平行机调度问题[J]. 管理工程学报, 2013, 27(1):56-62.
Li Kai, Shi Ye, Ma Ying. Parallel Machine Scheduling Problems with a Convex Resource Consumption Function to Minimize the Makespan[J]. Journal of Industrial Engineering/Engineering Management, 2013; 27(1):56-62.
[14]Vidal J C, Mucientes M, Bugarí N A,et al. Machine Schedulingin Custom Furniture Industry Through Neuro-evolutionary Hybridization[J]. Applied Soft Computing, 2011, 11: 1600-1613.
[15]Bandyopadhyay S, Bhattacharya R. Solving Multi-objective Parallel Machine Scheduling Problem by a Modified NSGA-Ⅱ[J]. Applied Mathematical Modelling, 2013, 37: 6718-6729.
[16]Guo Z X, Wong W K, Li Z,et al. Modeling and Pareto Optimization of Multi-objective Order Scheduling Problems in Production Planning[J]. Computers & Industrial Engineering, 2013, 64: 972-986. |