[1]朱合华[1],徐前卫[1,2],廖少明[1],于宁[1],傅德明[3],吴祥松[1].土压平衡盾构施工的顶进推力模型试验研究[J].岩土力学,2007,28(8):1587-1594.
[2]Zhang Kaizhi, Yu Haidong, Liu Zhongpo, et al. Dy- namic Characteristic Analysis of TBM Tunnelling in Mixed-- face Conditions [J]. Simulation Modeling Practice and Theory,2010,18(7) : 1019-1031.
[3]黄宏伟[1],闫玉茹[1],胡群芳[2].复合式土压平衡盾构刀盘失效风险分析[J].岩土力学,2009(8):2324-2330.
[4]陈小雄.现代隧道工程理论与隧道施工[M].成都:西南交通大学出版社,2006
[5]Zhao Jian, Gong Qiuming, Eisensten Z. Tunnelling Through a Frequently Changing and Mixed Ground:A Case History in Singapore[J]. Tunnel- ling and Underground Space Technology, 2007,22 (4) : 388-400.
[6]Cho J W, J eon S,Yu S H, et al. Optimum Spacing of TBM Disc Cutters: A Numerical Simulation Using the Three-dimensional Dynamic Fracturing Meth- od[J].Tunnelling and Underground Space Technol- ogy, 2010,25 (3): 230-244.
[7]Nilsen B, Dahl F, Holzhauser J, et al. Abrasivity of Soils in TBM Tunneling[J]. Tunnels & TunnellingInternational, 2006 (3) : 36-38.
[8]邢彤[1,2],龚国芳[1],杨华勇[1].盾构刀盘驱动扭矩计算模型及实验研究[J].浙江大学学报:工学版,2009(10):1794-1800. |