[1]祁国宁,顾新建,杨青海,余军合.大批量定制原理及关键技术研究[J].计算机集成制造系统,2003,9(9):776-783.
[2]顾新建[1],郑国君[1],朱万贵[1],崔梁萍[2].面向大批量定制生产的模块化制造系统[J].组合机床与自动化加工技术,2003(1):1-3.
[3]徐贤浩,马士华.顾客化大量生产环境下生产管理新模式的研究[J].中国机械工程,2001,12(8):897-900.
[4]苑明海[1],李东波[1],于敏建[1].面向大规模定制的混流装配线平衡研究[J].计算机集成制造系统,2008,14(1):79-83.
[5]李斌[1],陈立平[1],黄正东[1],肖人彬[1],钟毅芳[1].面向大规模定制的装配线优化调度研究[J].中国机械工程,2005,16(24):2198-2202.
[6]樊树海[1],肖田元[1],乔桂秀[1],董建华[1],张林鍹[1].大规模定制生产线的动态网络构造与仿真[J].系统仿真学报,2004,16(7):1597-1599.
[7]Bidanda B,Poonsiri A,Kim L N,et al. Human--re lated Issues in Manufacturing Cell Design, Imple mentation, and Operation: a Review and Survey[J].Computer & Industrial Engineering, 2005,48 (3): 507-523.
[8]Kaku I,Murase Y,Yin Y. A Study on Human Tasks Related Performances of Converting Conveyor As- sembly Line to Cellular Manufacturing[J]. Europe- an Journal of Industrial Engineering, 2008,2( 1 ) : 17- 34.
[9]Johnson D J. Converting Assembly Lines to Assem- bly Cells at Sheet Metal Products: Insights on Per formance Improvements[J]. International Journal of Production Research,2005,43(7) : 1483-1509.
[10]Sakazume Y. Is Japanese Cell Manufacturing a New System? a Comparative Study between Jap- anese Cell Manufacturing and Cellular Manufac turing[J]. Journal of Japan Industrial Manage- ment Association, 2005,55 (6) : 341-349.
[11]Kaku Ikou, Gong Jun, Tang Jiafu, et al. Modeling and Numerical Analysis of Line cell Conversion Problems[J]. International Journal of Production Research,2009,47(8) :2055-2078.
[12]Bratch A I,Dolgui A. Some New Results on the A- nalysis and Simulation of Bucket Brigades(Self balancing Production lanes) [ J ]. International Journal of Production Research,2009,47(2) :369- 387.
[13]Lim Y F, Yang K K. Maximizing Throughput of Bucket Brigades on Discrete Work Stations [J]. Production & Operations Management, 2009,18 (1):48-59.
[14]Nakade K, Nishiwaki R. Optimal Allocation of Heterogeneous Workers in a U- shaped Produc- tion Line[J]. Computers& Industrial Engineer ing,2008,54(3) :432-440.
[15]Wang Q, Owen G W, Mileham A R. Determining Numbers of Workstations and Operators for a Linear Walking--worker Assembly Line[J]. In- ternational Journal of Computer Integrated Manu facturing, 2007,20 ( 1 ) : 1-10.
|