[1]李伯虎,柴旭东,等.复杂产品集成制造系统技术[J].航空制造技术,2002(12):17-20.
[2]Eppinger S D, Salminen V K. Patterns of Product Development Interactions [C]//International Con- ference on Engineering Design. Glasgow, Scotland: ICED, 2001:283-290.
[3]孙清超[1],郭钢[1].面向多产品协同开发的项目管理研究[J].计算机集成制造系统,2008,14(11):2204-2211.
[4]施国强[1],李伯虎[1],柴旭东[2].基于着色Petri网的复杂产品开发多项目调度建模研究[J].系统仿真学报:3869-3872.
[5]谈烨,仲伟俊.多种资源在多项目间分配的两层决策方法[J].系统工程学报,1999,14(3):290-295.
[6]Cohen I, Golany B, Shtub A. Managing Stochastic, Finite Capacity, Multi- proiect Systems through the Cross- Entropy Methodology[J]. Annals of Operations Research, 2005, 134(1): 183-199.
[7]Anavi--Isakow S,Golany B. Managing Multi--pro ject Environments Through Constant Work--in- process[J]. International Journal of Project Man agement,2003, 21(1): 9-18.
[8]寿涌毅[1].资源约束下多项目调度的迭代算法[J].浙江大学学报:工学版,2004,38(8):1095-1099.
[9]Goncalves J F, Mendes J J M, Resende M G C. A Genetic Algorithm for the Resource Constrained Multi-- project Scheduling Problem [J].. European Journal of Operational Research, 2008, 189 (3) 1171-1190.
[10]朱传军[1,2],张超勇[2],管在林[2],刘琼[2].一种求解Job--shop调度问题的遗传局部搜索算法[J].中国机械工程,2008,19(14):1707-1711.
[11]郭研[1],宁宣熙[1].利用遗传算法求解多项目资源平衡问题[J].系统工程理论与实践,2005,25(10):78-82.
[12]McQuarrie A J. Fire Fighting in Aerospace Prod- uct Development: A Study of Project Capacity and Resource Planning in an Aerospace Enterprise [D]. Cambridge,MA: Massachusetts Institude of Technology, 2003. |