Periodicals with Social and Economic Benefits
Core Journals of China
China’s Core Scientific Journals
RCCSE Periodical
Chinese Applied Core Journals (CACJ)
Periodicals in WJCI Report
SUN Aihong, SONG Yuchuan, YANG Yunfan, LEI Qi. Dual Resource-constrained Flexible Job Shop Scheduling Algorithm Considering Machining Quality of Key Jobs[J]. China Mechanical Engineering, 2022, 33(21): 2590-2600.
[1]MONDHER D, HOUSSEM E N, OLFA B D, et al. Dual-resource Constraints in Classical and Flexible Job Shop Problems:a State-of-the-art Review[J]. Procedia Computer Science, 2018, 126:1507-1515.
[2]GONG G, RAYMOND C, DENG Q, et al. A Hybrid Artificial Bee Colony Algorithm for Flexible Job Shop Scheduling with Worker Flexibility[J]. International Journal of Production Research, 2020, 58(14):167-178.
[3]DOMINIK K, DAVID M, JENNY N. A Worker Constrained Flexible Job Shop Scheduling Problem with Sequence-dependent Setup Times[J]. OR Spectrum, 2019, 41(1):179-217.
[4]GONG G, DENG Q, GONG X, et al. A New Double Flexible Job-shop Scheduling Problem Integrating Processing Time, Green Production, and Human Factor Indicators[J]. Journal of Cleaner Production, 2018, 174:560-576.
[5]WU X, PENG J, XIAO X, et al. An Effective Approach for the Dual-resource Flexible Job Shop Scheduling Problem Considering Loading and Unloading[J]. International Journal of Intelligent Manufacturing, 2021, 32:707-728.
[6]孔繁森, 高天宇, 李惠敏, 等. 考虑任务复杂性的人机联合任务分配问题研究[J]. 机械工程学报, 2021, 57(7):204-214.
KONG Fansen, GAO Tianyu, LI Huimin, et al. Research on Human-robot Joint Assignment Considering Task Complexity[J]. Journal of Mechanical Engineering, 2021, 57(7):204-214.
[7]王超, 黄波, 贾春兰, 等. 考虑加工质量和生产成本的柔性作业车间调度问题研究[J]. 机械, 2012, 39(12):10-14.
WANG Chao, HUANG Bo, JIA Chunlan,et al. Research on Flexible Job-shop Scheduling Problem Considering Production Cost and Product Quality[J]. Machinery, 2012, 39(12):10-14.
[8]朱光宇, 徐文婕. 考虑能耗与质量的机床构件生产线多目标柔性作业车间调度方法[J]. 控制与决策, 2019, 34(2):252-260.
ZHU Guangyu, XU Wenjie. Multi-objective Flexible Job Shop Scheduling Method for Machine Tool Component Production Line Considering Energy Consumption and Quality[J]. Control and Decision, 2019, 34(2):252-260.
[9]蒋增强, 左乐. 低碳策略下的多目标柔性作业车间调度[J]. 计算机集成制造系统, 2015, 21(4):1023-1031.
JIANG Zengqiang, ZUO Le. Multi-objective Flexible Job-shop Scheduling Based on Low-carbon Strategy[J]. Computer Integrated Manufacturing Systems, 2015, 21(4):1023- 1031.
[10]周亚勤, 杨长祺, 吕佑龙, 等. 双资源约束的航天结构件车间生产调度方法[J]. 机械工程学报, 2018, 54(9):55-63.
ZHOU Yaqin, YANG Changqi, LYU Youqiao, et al. Scheduling the Production of Aerospace Parts with Dual Resource Constraints[J]. Journal of Mechanical Engineering, 2018, 54(9):55-63.
[11]娄航宇, 张吉善, 赵云博. 基于扩展双资源约束型航空构件制造车间调度方法[J]. 计算机集成制造系统, 2020, 26(12):3329-3340.
LOU Hangyu, ZHANG Jishan, ZHAO Yunbo. Scheduling Method for Aerospace Components Production Shop Based on Extended Dual Resource Constraints[J]. Computer Intergrated Manufacturing Systems, 2020, 26(12):3329-3340.
[12]刘晓阳, 刘恩福, 靳江艳. 基于蚁群算法的异步并行装配序列规划方法[J]. 机械工程学报, 2019, 55(9):107-119.
LIU Xiaoyang, LIU Enfu, JIN Jiangyan. Asynchronous Parallel Assembly Sequence Planning Based on Ant Colony Algorithm[J]. Journal of Mechanical Engineering, 2019, 55(9):107-119.
[13]黄学文, 张晓彤, 艾亚晴. 基于蚁群算法的多加工路线柔性车间调度问题[J]. 计算机集成制造系统, 2018, 24(3):558-569.
HUANG Xuewen, ZHANG Xiaotong, AI Yaqing. ACO Integrated Approach for Solving Flexible Job Shop Scheduling with Multiple Process Plans[J]. Computer Intergrated Manufacturing Systems, 2018, 24(3):558-569.
[14]张洁, 秦威, 宋代立. 考虑工时不确定的混合流水车间滚动调度方法[J]. 机械工程学报, 2015, 51(11):99-108.
ZHANG Jie, QIN Wei, SONG Daili. Rescheduling Algorithm Based on Rolling Horizon Procedure for a Dynamic Hybrid Flow Shop with Uncertain Processing Time[J]. Journal of Mechanical Engineering, 2015, 51(11):99-108.
[15]MENG Leilei, ZHANG Chaoyong, ZHANG Biao, et al. Mathematical Modeling and Optimization of Energy-conscious Flexible Job Shop Scheduling Problem with Worker Flexibility[J]. IEEE Access, 2019, 7:68043-68059.
[16]李兢尧, 黄媛, 王军强. 基于压缩时窗的双资源约束作业车间调度策略[J]. 计算机集成制造系统, 2016, 22(12):2827-2835.
LI Jingyao, SUN Shudong, WANG Junqiang. Scheduling Strategy of Dual Resource Constrained Job Shop Based on Compressed Time Window[J]. Computer Intergrated Manufacturing Systems, 2016, 22(12):2827-2835.
[17]李兢尧, 孙树栋, 黄媛, 等. 基于时窗的双资源约束车间调度研究[J]. 机械工程学报, 2011, 47(16):150-159.
LI Jingyao, SUN Shudong, HUANG Yuan, et al. Research on Dual Resource Constrained Job Shop Scheduling Based on Time Window[J]. Journal of Mechanical Engineering, 2011, 47(16):150-159.
[18]BRANDIMARTE P. Routing and Scheduling in a Flexible Job Shop by Tabu Search[J]. Annals of Operations Research, 1993, 41(3):157-183.
[19]LEI D, GUO X. Variable Neighbourhood Search for Dual-resource Constrained Flexible Job Shop Scheduling[J]. International Journal of Production Research, 2014, 52(9):2519-2529.