Periodicals with Social and Economic Benefits
Core Journals of China
China’s Core Scientific Journals
RCCSE Periodical
Chinese Applied Core Journals (CACJ)
Periodicals in WJCI Report
CHEN YarongHUANG PeiyuLI PeiCHOU FuhderHUANG Shengquan. Model and Algorithm of Paravlel Multiprocessor Open Shop Scheduling Problem[J]. China Mechanical Engineering.
[1]ANAND E,PANNEERSELVAM R.Literature Review of Open Shop Scheduling Problems[J].Intelligent Information Management,2015,7(1):33-52.
[2]NADERI B,GHOMI S M T F,AMINNAYERI M,et al.Scheduling Open Shops with Parallel Machines to Minimize Total Completion Time[J].Journal of Computational and Applied Mathematics,2011,235(5): 1275-1287.
[3]ABDELMAGUID T F,SHALABY M A,AWWAD M A.A Tabu Search Approach for Proportionate Multiprocessor Open Shop Scheduling [J].Computational Optimization & Applications,2014,58(1): 187-203.
[4]SHIANG W J,LIN Y H,RAU H.Application of Simulation to the Scheduling Problem for a LED Sorting System[C]//IEEE International Conference on Machine Learning and Cybernetics.Baoding,China: ICMLC,2009: 2875-2879.
[5]ROEMER T A.A Note on the Complexity of the Concurrent Open Shop Problem[J].Journal of Scheduling,2006,9(4): 389-396.
[6]BRSEL H,HERMS A,MRIG M,et al.Heuristic Constructive Algorithms for Open Shop Scheduling to Minimize Mean Flow Time[J].European Journal of Operational Research,2008,189(3): 856-870.
[7]TANG L,BAI D.A New Heuristic for Open Shop Total Completion Time Problem[J].Applied Mathematical Modelling,2010,34(3):735-743.
[8]AHMADIZAR F,FARAHANI M H.A Novel Hybrid Genetic Algorithm for the Open Shop Scheduling Problem[J].International Journal of Advanced Manufacturing Technology,2012,62(5/8):775-787.
[9]NADERI B,FATEMI GHOMI S M T,AMINNAYERI M,et al.A Study on Open Shop Scheduling to Minimize Total Tardiness [J].International Journal of Production Research,2011,49(15): 4657-4678.
[10]王军强,郭银洲,崔福东,等.基于多样性增强的自适应遗传算法的开放式车间调度优化[J].计算机集成制造系统,2014,20(10):2479-2493.
WANG Junqiang,GUO Yinzhou,CUI Fudong,et al.Diversity Enhancement-based Adaptive Genetic Algorithm for Open-shop Scheduling Problem[J].Computer Integrated Manufacturing System,2014,20(10): 2479-2493
[11]HUANG Y M,LIN J C.A New Bee Colony Optimization Algorithm with Idle-time-based Filtering Scheme for Open Shop-scheduling Problems[J].Expert Systems with Applications,2011,38(5):5438-5447.
[12]高亮,高海兵,周驰.基于粒子群优化的开放式车间调度[J].机械工程学报,2006,42(2):129-134.
GAO Liang,GAO Haibin,ZHOU Chi.Open Shop Scheduling Based on Particle Swarm Optimization [J].Chinese Journal of Mechanical Engineering,2006,42(2): 129-134.
[13]SHA D Y,HSU C Y.A New Particle Swarm Optimization for the Open Shop Scheduling Problem [J].Computers & Operations Research,2008,35(10):3243-3261.
[14]NASIRI M M,YAZDANPARAST R,JOLAI F.Simulation Optimization Approach for Optimizing Jobs Dispatching Rule in an Open Shop Scheduling Problem[J].International Journal of Computer Integrated Manufacturing,2017,30(46):1239-1252.
[15]BAI D,ZHANG Z,ZHANG Q.Flexible Open Shop Scheduling Problem to Minimize Makespan[J].Computers & Operations Research,2015,67(1): 207-215.
[16]WANG W L,WANG H Y,ZHAO Y W,et al.Parallel Machine Scheduling with Splitting Jobs by a Hybrid Differential Evolution Algorithm[J].Computers & Operations Research,2013,40(5):1196-1206.
[17]MATTA M E.A Genetic Algorithm for the Proportionate Multiprocessor Open Shop[J].Computers & Operations Research,2009,36(9): 2601-2618.
[18]CHEN Y,ZHANG A,CHEN G,et al.Approximation Algorithms for Parallel Open Shop Scheduling[J].Information Processing Letters,2013,113(7):220-224.
[19]展勇,邱长华,祝海涛.基于网络流的多并行机可中断开放车间调度算法[J].计算机集成制造系统,2011,17(5): 990-996.
ZHAN Yong,QIU Changhua,ZHU Haitao.An Interruptible Multiprocessor Open Shop Scheduling Algorithm Based on Network Flow [J].Computer Integrated Manufacturing System,2011,17(5):990-996.
[20]BEAN J.Genetic Algorithms and Random Keys for Sequencing and Optimization[J].Orsa Journal on Computing,1994,6:154-160.