An Multi-objective Optimized Production Scheduling for Automobile Prototype Workshops Considering Employee Work Ability#br#
YI Qian1;HE Shuang2;NING Qing2;LI Congbo1;YI Shuping2
1.State Key Laboratory of Mechanical Transmission,Chongqing University,Chongqing,400030
2.College of Mechanical and Vehicle Engineering,Chongqing University,Chongqing,400030
YI Qian, HE Shuang, NING Qing, LI Congbo, YI Shuping. An Multi-objective Optimized Production Scheduling for Automobile Prototype Workshops Considering Employee Work Ability#br#[J]. China Mechanical Engineering, 2021, 32(13): 1617-1629.
[1]孟铁.浅析中国新能源汽车产业发展现状及趋势[J]. 时代汽车, 2019(6):83-84.
MENG Tie. Analysis of the Development Status and Trend of China’s New Energy Automobile Industry[J]. Times Auto, 2019(6):83-84.
[2]杨续昌, 陈友玲, 刘传彪.大规模定制环境下基于员工作业能力差异指数的标准时间研究[J]. 世界科技研究与发展, 2015(4):87-92.
YANG Xuchang, CHEN Youling, LIU Chuanbiao. Research on Standard Time Based on the Difference Index of Employees’ Working Ability in Mass Customization Environment[J]. World Science and Technology Research and Development, 2015(4):87-92.
[3]BECK B, BILLING D C, CARR A J. Developing Physical and Physiological Employment Standards:Translation of Job Analysis Findings to Assessments and Performance Standards—a Systematic Review[J]. International Journal of Industrial Ergonomics, 2016, 56:9-16.
[4]ZHANG X C, KUCHINKE L, WOUD M L, et al. Survey Method Matters:Online/Offline Questionnaires and Face-to-face or Telephone Interviews Differ[J]. Computers in Human Behavior, 2017, 71:172-180.
[5]KERATAR R,TAANILA A, JOKELAINEN J, et al. Work Disabilities and Unmet Needs for Health Care and Rehabilitation among Jobseekers:a Community-level Investigation Using Multidimensional Work Ability Assessments[J]. Scandinavian Journal of Primary Health Care, 2016, 34(4):343-351.
[6]杨宇, 黄敏, 王震宇, 等.利用有限制稳定配对策略求解双目标柔性作业车间调度问题[J]. 中国机械工程, 2018, 29(14):1743-1750.
YANG Yu, HUANG Min, WANG Zhenyu, et al. olving Bi-objective FJSP Using Limited Stable Matching Strategy[J]. China Mechanical Engineering, 2018, 29(14):1743-1750.
[7]ANDRES A G, STEPHANE D, YAZID M. An Efficient Pareto Approach for Solving the Multi-objective Flexible Job-shop Scheduling Problem with Regular Criteria[J]. Computers & Operations Research, 2019, 108:187-200.
[8]刘彩洁, 徐志涛, 张钦, 等. 分时电价下基于NSGA-Ⅱ的柔性作业车间绿色调度[J]. 中国机械工程, 2020, 31(5):576-585.
LIU Caijie, XU Zhitao, ZHANG Qin, et al. Green Scheduling of Flexible Job Shops Based on NSGA-Ⅱ under TOU Power Price[J]. China Mechanical Engineering, 2020, 31(5):576-585.
[9]MAHMOODJANLOO M, TAVAKKOLI-M R, BABOLI A, et al. Flexible Job Shop Scheduling Problem with Reconfigurable Machine Tools:an Improved Differential Evolution Algorithm[J]. Applied Soft Computing, 2020, 94(5):106416.
[10]LANG Maotao, LI Hua.Research on Dual-resource Multi-objective Flexible Job Shop Scheduling under Uncertainty [C]∥ 2nd International Conference on Artificial Intelligence, Management Science and Electronic Commerce(AIMSEC). Dengfeng,2011:1375-1378.
[11]LEI Deming, GUO Xiuping. Variable Neighbourhood Search for Dual-resource Constrained Flexible Job Shop Scheduling[J]. International Journal of Production Research, 2014, 52(9):2519-2529.
[12]ZHANG Jing, WANG Wanliang, XU Xinli.A Hybrid Discrete Particle Swarm Optimization for Dual-resource Constrained Job Shop Scheduling with Resource Flexibility[J]. Journal of Intelligent Manufacturing, 2017, 28:1961-1972.
[13]吴定会, 孔飞, 朱绍文,等. 生物地理学算法求解柔性车间作业调度问题[J]. 计算机工程与应用, 2015, 51(22):206-213.
WU Dinghui, KONG Fei, ZHU Shaowen, et al.Biogeography-based Optimization Algorithm for Flexible Job-shop Scheduling Problems[J]. Computer Engineering and Applications, 2015, 51(22):206-213.
[14]袁志玲, 袁逸萍, 孙文磊,等. 采用遗传算法的双资源柔性车间调度问题研究[J]. 现代制造工程, 2013(12):21-25
YUAN Zhiling, YUAN Yiping, SUN Wenlei, et al. Study of Flexible Job Shop Scheduling Problems with Dual-resource Based on Genetic Algorithm[J]. Modern Manufacturing Engineering, 2013(12):21-25.
[15]ZHENG Xiaolong, WANG Ling. A Knowledge-guided Fruit Fly Optimization Algorithm for Dual Resource Constrained Flexible Job-shop Scheduling Problem[J]. International Journal of Production Research, 2016, 54(18):5554-5566.
[16]周亚勤, 杨长祺, 吕佑龙,等. 双资源约束的航天结构件车间生产调度方法[J]. 机械工程学报, 2018, 54(9):55-63.
ZHOU Yaqin, YANG Changqi, LYU Youlong, et al.Scheduling the Production of Aerospace Structural Parts with Dual Resource Constraints[J]. Journal of Mechanical Engineering, 2018, 54(9):55-63.
[17]ANDRADE-PINEDA J L, CANCA D, GONZALEZ-R P L, et al. Scheduling a Dual-resource Flexible Job Shop with Makespan and Due Date-related Criteria[J]. Annals of Operations Research, 2020, 291:5-35.
[18]HASCHKE A, ABBERGER B, WIRTZ M, et al. Development of Short Form QuestionnAires for the Assessment of Work Capacity in Cardiovascular Rehabilitation Patients [J]. International Journal of Occupational Medicine & Environmental Health, 2013, 26(5):742-50.
[19]张莉, 冯定忠, 王林军. 产品关键特性的识别过程与分解方法[J]. 中国机械工程, 2013, 24(15):2025-2030.
ZHANG Li, FENG Dingzhong, WANG Linjun. Identification Process and Decomposition Method for Product Key Characteristics[J]. China Mechani-cal Engineering, 2013,24(15):41-46.
[20]TSAI S B.Using the DEMATEL Model to Explore the Job Satisfaction of Research and Development Professionals in China’s Photovoltaic Cell Industry [J]. Renewable & Sustainable Energy Reviews, 2018, 81:62-68.
[21]WU Weiwen. Choosing Knowledge Management Strategies by Using a Combined ANP and DEMATEL Approach[J]. Expert Systems with Applications, 2008, 35(3):828-835.
[22]ZHOU Xinyi, HU Yong, DENG Yong, et al. A DEMATEL-based Completion Method for Incomplete Pairwise Comparison Matrix in AHP[J]. Annals of Operations Research, 2018, 271(2):1-22.