J4 ›› 2007, Vol. 18 ›› Issue (22): 0-2771.

• 制造系统 •    

工艺计划与车间作业计划集成系统的研究

鞠全勇1,2 朱剑英2 袁 坤2   

  • 收稿日期:1900-01-01 修回日期:1900-01-01 出版日期:2007-11-25 发布日期:2007-11-25

Study on Integrated System of Process Planning and Dynamic Job Shop Scheduling 

Ju Quanyong 1,2 Zhu Jianying 2 Yuan Kun2   

  • Received:1900-01-01 Revised:1900-01-01 Online:2007-11-25 Published:2007-11-25

摘要:

分析了现有工艺计划与车间作业计划的系统
集成模型,建立了企业生产工艺计划与作业计划的层次结构,提出了面向车间作业计划的动态、分布式工艺计划与车间作业计划集成模型。将工艺计划与基于周期和事件驱动的动态作业计划相结合,把改进的离散化粒子群算法引入车间优化作业计划运算,使集成模型中
生产作业计划与控制功能得以实现。实例证明了集成系统的可行性和有效性。

关键词: 工艺计划;车间作业计划;粒子群算法;集成模型;层次结构

Abstract:

The integrated model of process planning and job shop scheduling system in existence was analyzed. The hierarchy structure of process planning
and job shop scheduling was constructed in the integrated model.An integrated model of distributed and dynamic process planning and job shop scheduling was proposed.
It’s combined process planning with dynamic rolling windows scheduling based on
period and event-driven.The improved particle swarm algorithm which
was dispersed to suit for job shop schedule was introduced to job shop scheduling operation.Consequently, the function of job shop scheduling and control of the integration module was realized. Finally,feasibility and validity of the integrated system was validated by an example.

Key words: process planning;job shop scheduling;particle swarm algorithm;integration model;hierarchy structure

中图分类号: